• Complex of works on the project: “The cogeneration turbine P-50-130/13 (50MW) " at the Novo-Irkutskaya CHPP.
• Turnkey works on reconstruction of chimneys for boiler installation within the project "Development of heavy oil deposits by JSC "Tatneft"" for the boiler "Severo-Ashalchinskaya".
• Installation, reconstruction, modernization, repair and commissioning of all types of main and auxiliary power equipment for thermal power plants of JSC "Irkutskenergo“,JSC "TGC-6" (JSC "Volzhskaya TGC").
• The works on the maitenance and repair of the TPP equipment of Bratsk branch (Group "Ilim").
• The overhaul of turbine unit K-215-130 and turbogenerator ТГВ-200-2МУЗ, turbogenerator ТВГ-200-2М No3 at Kharanorskaya State District Power Station.
• The installation of steam turbine unit SST5-50000 (Siemenc AG) at the Novo-Salavatskaya CHPP.
• Design and construction of the main heating networks of JSC "Irkutskenergo“.
• The complex of works on the construction of co-generation plant in Ust-Labinskiy district of Krasnodar region (capacity - 4 MW).
• The reconstruction of the centralized heat supply system of the Avan district, Erevan, the Republic of Armenia.
• Development of design documentation on the project "The reconstruction of Avtozavodskaya CHP with construction zone of CCGP-400 " and substantiation for investment on the project “Lenskaya thermal power station” (estimated capacity -1,200 MW).

Main customers:
• JSC "Irkutskenergo“,
• ООО «Avtozavodskaya CHPP»,
• JSC «ТGK-6»,
• JSC "Tatneft"
• Industrial enterprises of Eastern Siberia and Zabaikalsky region,
• Municipal governments