Electric power network facilities

Main/Projects/Electric power network facilities

Expantion and reconstruction of substations:
• Expansion and reconstruction of the existing substation 500/110/35 kV Taishet
• The complex of works to expand the substation Taishet-2 (Ozernaya) in the part of the connection overhead transmission line (500 kV) from the substation Angara to the substation Taishet-2 (Ozernaya);
• The complex of works on the project “Reconstruction of substation 200 kV Baikal PPM” (design, construction, installation and commissioning works);
• The construction and installation, commissioning works on the project "Reconstruction of substation 110 kV "Studencheskaya"";
• The complex of works to expand the substation 500 kV Ozernaya in the part of the connection overhead transmission line (500 kV) " Boguchanskaya GES –Ozernaya”;
• Construction, repair, reconstruction of power grid facilities till 110 kV of Olympic infrastructure and JSC "Kubanenergo“.

Construction of new substations:
• Construction of the new substation 500/110/35 кВ "Ozernaya";
• Construction of the substation 220/110/10 kV "Vostochnaya";
• Construction, installation and commissioning works, supply equipment on the project "Substation 110/10 kV "Elovka"; setting HVL-110 kV "CHPP-10-Meget" at substation 110/10 kV "Elovka””
• Construction and installation, commissioning works on the project "Substation 35/10 kV "MRS" with overhangs of 35 and 10 kV overhead line (the first launch complex)"

Construction of overhead transmission lines:
• Construction of two high voltage lines 500 kV between Taishet, Ozernaya and Bratskaya (Bratsk switching station - BSS), and also prolongation of the existing high voltage line 500 kv (BSS – Taishet);
• Construction, installation and commissioning works, supply equipment on the project:“Substation 220/110/10 kV Vostochnaya with overhead line 220 kV "Substation Irkutskaya - Substation Vostochnaya and overhead line 110 kV“;
• Construction and repair of overhead and cables lines with voltage class up to 110 kV or more on the objects of JSC "Kubanenergo”;
• Perform the full range of construction activities: "10 kV overhead lines Pokrovskaya-Novolisikha with switchgear 10 kV";
• Construction of the facility: "Electric Network of Gorny village. The first launch complex".

Main customers:
• JSC "Federal Grid Company",
• JSC " Irkutskaya elektrosetevaya Company",
• JSC "Kubanenergo“,
• KGKU “ Directorate for Integrated development of Nizhny Angara region”
 